HVAC SYSTEM PROJECT AT Al Amer Mall, 460 TR: Engineering Design (Heat Load verification on CHVAC Professional Software, Duct & refrigerant Pipe Routing, Sizing, ESP Calculations), Procurement & Installation of complete HVAC system with DDC Panels, Ductworks, Dampers, Air Distribution Devices, System commissioning & balancing
Specifications
Partner with Us
Discuss your upcoming HVAC or Electrical engineering projects with our expert estimators.
Request QuoteRelated Project Scope
Chiller Replacement, DAIKIN
Replacement of Sixteen Chiller Modules with the Supply & Installation of complete piping, valves packages, electrical power and control works along with instrumentation and associated cabling, cable trays, wiring and fiber optic cabling (Approx 1000 TR of Industrial Cooling)
HVAC Air-Side, AHUs, FCUs
Engineering design of Air-conditioning system for the air-side of Air-cooled Chillers, along with duct sizing, ESP calculations, AHU & FCU selections, sections, shop drawings. Supply & Installation of ductworks, air-distribution system and associated accessories (Approx 400 TR of Comfort Cooling)
Chiller Refurbishment, Tuhaimiyah Riyadh
Refurbishment of YORK Chillers 20 TR each (Train: 1-6) including Fregomeccanica pressurizing units for Saudi Aramco Pump Station-01, Tuhaimiyah, Riyadh – SEPCO