01
|
Chiller Replacement, DAIKIN
Al Ahsa, KSA
|
Replacement of Sixteen Chiller Modules with the Supply & Installation of complete piping, valves packages, electrical power and control works along with instrumentation and associated cabling, cable trays, wiring and fiber optic cabling (Approx 1000 TR of Industrial Cooling)
|
Ongoing
|
|
|
02
|
HVAC Air-Side, AHUs, FCUs
Jeddah Industrial City, KSA
|
Engineering design of Air-conditioning system for the air-side of Air-cooled Chillers, along with duct sizing, ESP calculations, AHU & FCU selections, sections, shop drawings. Supply & Installation of ductworks, air-distribution system and associated accessories (Approx 400 TR of Comfort Cooling)
|
Ongoing
|
|
|
03
|
ELECTRICAL WORKS, DIRIYAH
Riyadh, KSA
|
HVAC SYSTEM PROJECT AT QIDDIYA CAMP & ACCOMMODATION PROJECT, DHURMA, RIYADH, Lower Plateau & Upper Plateau sites total 14 Bldgs: Procurement & Installation of complete ELV system with associated other disciplines
|
Ongoing
|
|
|
04
|
Electrical Power
Al Hasa, KSA
|
ELECTRICAL POWER PROJECT AT Al Amer Hypermarket, 2MVA: Engineering Design (Power Load calculations, Switchgears, MRMUs, RMUs & Transformer selections), Procurement & Installation of complete Power system
|
Ongoing
|
|
|
05
|
HVAC, Electrical Power & Controls
Al Hasa, KSA
|
HVAC SYSTEM PROJECT AT Al Amer Mall, 460 TR: Engineering Design (Heat Load verification on CHVAC Professional Software, Duct & refrigerant Pipe Routing, Sizing, ESP Calculations), Procurement & Installation of complete HVAC system with DDC Panels, Ductworks, Dampers, Air Distribution Devices, System commissioning & balancing
|
Ongoing
|
|
|
07
|
HVAC, Electrical Power & Controls
Dammam, KSA
|
Engineering, Procurement & Installation of complete Turnaround HVAC system with Electrical Panels, Power lines & Controls including AHUs, FCUs, Water System Piping, Valve Package, VAM (vapor absorption chillers), Ductworks, Dampers, Aluminum Cladding at Al-Ittefaq Holding
|
Completed
|
|
|
08
|
Chiller Refurbishment, Tuhaimiyah Riyadh
Riyadh, KSA
|
Refurbishment of YORK Chillers 20 TR each (Train: 1-6) including Fregomeccanica pressurizing units for Saudi Aramco Pump Station-01, Tuhaimiyah, Riyadh – SEPCO
|
Completed
|
|
|
09
|
Engineering Design, HVAC, FPS, FAS
Ras Al Khair, KSA
|
Detailed Engineering for the HVAC, FPS, FAS & HVAC BMS system at Industrial Wastewater Plant (IWWTP) Admin Bldg, Ras Al Khair for Aramco Overseas – CES Salcon, Singapore
|
Completed
|
|
|
10
|
Process Piping works
Dammam, KSA
|
Phase-1&2; Modifications of Steam & Condensate lines for 200 Ton Boiler for NOV, 3rd Industrial Area, Dammam
|
Completed
|
|
|
11
|
Saudi Aramco
Dhahran, KSA
|
Retrofit & commission refrigerant lines for Laboratory Helium, Argon, oxygen & Nitrogen copper lines, including thermal insulation & aluminum cladding for Saudi Aramco, Well Core Plant (WCP Project), Dhahran
|
Completed
|
|
|
12
|
Al Mutawa Holding
Dammam, KSA
|
Chiller Water System, valve packages, metal fabrications etc. with GI air ductworks, Aluminum cladding and commissioning works at Dammam Seaport – King Abdul-Aziz Seaport authority
|
Completed
|
|
|
13
|
Private Villa
Dammam, KSA
|
Supply & installation of Package type A/c units, Concealed split units ducted DX type with GI ductworks, fiberglass insulation & aluminum cladding at Al Rabie Residential complex
|
Completed
|
|
|
14
|
SNC Lavalin-Fayez Engg H.O.
Al Khobar, KSA
|
Supply & Installation of Firefighting extension with new Fire Department Connection, Alarm check valve assembly including buried and exposed coated piping, Siemens Fire-finder XLS fire alarm system FACP integration
|
Completed
|
|
|
15
|
Dar Al Khidmah
Dhahran, KSA
|
Turnkey HVAC Works, supply & installation, refurbishment, condenser re-tubing, Heat Exchanger refurbishment and up-gradation of ventilation system at SAUDI ARAMCO, ITRAH TOWER (King Abdul-Aziz Center for World Culture)
|
Completed
|
|
|
16
|
Dammam Seaport
Dammam, KSA
|
Supply & Installation of HVAC Chilled water system with expansion tank, primary & secondary booster pumps, accessories, air devices, refrigeration system, chilled water piping system with tertiary booster pumps & chillers (Turnkey Job) at Mena Dammam – Saudi Customs
|
Completed
|
|
|
17
|
MRBME
Riyadh, KSA
|
Refurbishment of York 20 TR each Air-Cooled Chillers and Fregomeccanica Pressurizing units at TR-01 & TR-03 for SAUDI ARAMCO BCGS-5, DHURMA, Riyadh
|
Completed
|
|
|
18
|
Saudi Aramco
Dhahran, KSA
|
Engineering, Procurement & Installation of complete HVAC DX System for Fire Extension Building, Saudi Aramco, Dhahran – AZM Kingdom Contracting LLC
|
Completed
|
|
|
19
|
Al FANAR Mall
Dammam, KSA
|
Chiller replacement THERMAX (350 TR), associated piping, valves, thermal insulation, controls and power cables with cable trays, exhaust fume duct installation & weather proofing at Al FANAR Mall, Hyper Panda
|
Completed
|
|
|
20
|
Ras Al Khair Power Plant
Ras Al Khair, KSA
|
Supply & Installation of HVAC System for the SWCC Project on sub-contract basis with SEEPCO-II, China
|
Completed
|
|
|
21
|
FARABI Petrochemicals
Jubail, KSA
|
Engineering, Supply & Installation of HVAC & Refrigeration System for the SS-86 & IT rooms along with Power Panels, Cabling wiring and hooking-up with the existing Fire Alarm System & FACP
|
Completed
|
|
|
22
|
King Faisal University
Al Hasa, KSA
|
Supply & Installation of Complete HVAC System for B-03, including AHUs, FCUs, Exhaust & Fresh Air Fans, Ductworks, VAVs, CAVs, Accessories, Chilled Water Piping, Valve Packages & Associated Accessories with system testing, commissioning and balancing (Approx 440 TR)
|
Completed
|
|
|
23
|
KFMC
Dammam, KSA
|
Supply & Installation of HVAC & associated Electrical Power & Control systems, including PACUs, Exhaust Fans, Ductworks & Associated Accessories along with system start-up, testing, commissioning and balancing (Approx 250 TR)
|
Completed
|
|